The Work Phase section of the Project Details tab provides users with the ability to add and/or edit work phase information. This section will be collapsed by default, but it can be expanded by clicking on the ribbon header and/or the caret icon.
Fields
These fields will be available in this section of the Details tab:
| Field | Description |
|---|---|
| Phase Tag | This is a picklist containing the values from the Phase Tag Code List. |
| Sub-Phase | This is a picklist containing the values from the Sub Phase Code List. |
| Asset Class | This is a picklist containing the values from the Asset Class Code List. |
| Asset Owner | This is a picklist containing the values from the Asset Owner Code List. |
Comments
0 comments
Please sign in to leave a comment.